Sale!

Groen 171061 8.5 Inch Reed Switch Assembly with 32 Inch Long Leads

Original price was: $211.14.Current price is: $52.78.

SKU: 8811865669886 Category:

Description

Groen 171061 Reed Switch Assembly, 32″ Long Leads, Groen Steamer C/2-e C/2-g Cc20-e Cc20-g

Reviews

There are no reviews yet.

Be the first to review “Groen 171061 8.5 Inch Reed Switch Assembly with 32 Inch Long Leads”

Your email address will not be published. Required fields are marked *